Booster Pump Project
Milestone timeline

A project to construct a booster pump for the water system, in the vicinity of the existing meter vault, in order to allow the Town to better control the pressure within the system.
SEPI Engineering & Construction, Inc.
Engineering and Design
Wells Brothers Construction
Construction Contractor
Project Updates
Booster pump testing has been completed. The contractor will be completing site restoration work and electrical punch list items.
Testing and acceptance of the booster pumps is continuing.
The booster pumps have been installed. Testing and acceptance is being coordinated.
The booster pumps arrived on November 1, 2019. Installation is being coordinated with the contractor.
The booster pumps have been shipped with an expected delivery date on Friday, November 1, 2019.
Preparatory site work will be completed this week in anticipation of the new pump delivery. Water service will not be interrupted for this work.