Brunswick Village Blvd Extension Paving & Kay Todd Road Multi-Use Path

Milestone timeline

Design
May 2022
Bid Closing
June 2022
Notice to Award
July 2022
Construction Commences
August 2022

A project to extend Brunswick Village Boulevard across Kay Todd Road as well as install stormwater catch basins, three stormwater ponds, install a multi-use path along Kay Todd Road, and pave Brunswick Village Blvd Extension from Kay Todd Road to Hewett-Burton Road.

Hanover Design Services, P.A.

Engineering and Design

TBD

Construction Contractor

Brunswick Village Boulevard Extension
Brunswick Village Boulevard Extension

Project Updates

Final Plans
Friday, April 22, 2022

Final Construction drawings and bid documents are being finalized by the Engineer and the project will go to Advisement in May.