A project to repair the street in 12 locations along Mallory Creek Drive. Work shall consist of full depth asphalt replacement of all failed locations along the approximate first mile of Mallory Creek Drive from River Road SE (Highway 133), stormwater system modifications, asphalt removal, subbase removal, testing, compaction, base replacement, asphalt replacement, striping, curb and gutter replacement, adjusting water and sewer utility appurtenances to match final grade, erosion control measures and stabilization of all denuded areas, and a submitted and approved traffic control plan including installation.

SEPI Engineering & Construction, Inc.

Engineering and Design

S.T. Wooten Corporation

Construction Contractor

Project Updates

Council Approval
Friday, July 19, 2019

Town Council approved the Notice To Award at the Regular Council Meeting on July 18.