Town Projects

Active Projects

Lift Station 1 Relocation (1035 Grandiflora Drive) Lift Station 1 Relocation A project to reconstruct Lift Station #1 which has deteriorated due to significant sewage flow within the collection system.
Leland Fire Station 53 A project for the construction of a new fire station off of Highway 17.
Highway 17 Sewer Expansion II Phase 1 A project to help serve the developing areas along the Highway 17 Corridor with sewer. 
Regional Pump Station #33 and Force Main Extension Regional Pump Station #33 and Force Main Extension A project to construct a sewer lift station in Brunswick Forest to help serve the developing areas within Brunswick Forest and along the Highway 17 Corridor with sewer. 
Mallory Creek Drive Patching Project Mallory Creek Drive Patching Project A project to repair portions of Mallory Creek Drive which have deteriorated over time and to make improvements to the stormwater system associated with the road.
Northgate Drive Realignment Project Northgate Drive Realignment Project A project to realign Northgate Drive and Lee Drive to create a signalized intersection at Village Road.
Future Town Projects Construction Image The following projects are currently under consideration, review, or design.

Completed Projects

Highway 17 Forcemain/Lift Station #10 Upgrade Project Lift Station 10 A project to help serve the developing areas along the Highway 17 Corridor with sewer and to increase available storage capacity for an existing lift station.
Booster Pump Project Brunswick Forest Booster Pump A project to construct a booster pump for the water system, in the vicinity of the existing meter vault.