Stormwater Inspections

In accordance with the Town's Stormwater Ordinance, annual inspections of stormwater control measures are required to be conducted and submitted to the Town. These inspections are due each year on or before the anniversary date of the installation of the stormwater control measure.

STORMWATER ORDINANCE

 

Inspection Reports

Annual inspection reports must be completed on forms included in the Stormwater Design Manual. These forms are listed below. Email inspection reports to Adrianna Weber, Town Engineer.

 

STORMWATER DESIGN MANUAL

SCM101 - COVER SHEET

SCM102 - INFILTRATION SYSTEM

SCM103 - BIORETENTION CELL

SCM104 - WET POND

SCM105 - STORMWATER WETLAND

SCM106 - PERMEABLE PAVEMENT

SCM107 - SAND FILTER

SCM108 - RAINWATER HARVESTING

SCM109 - GREEN ROOF

SCM110 - LEVEL SPREADER / FILTER STRIP

SCM111 - DISCONNECTED IMPERVIOUS SURFACE

SCM112 - TREATMENT SWALE

SCM113 - DRY POND