Skip to main content

Town of Leland Roadway Resurfacing 2026-2027

Highland Hills Drive

The Town of Leland is proposing to resurface 5% of Town owned roadways annually. The scope of the project includes milling, full depth patches as needed, asphalt overlay, new pavement markings, and replace and install new street signs as needed. The streets being considered for resurfacing include Emberwood Drive, Bowden Court, South Palm Drive, Grace Point Drive, Beachwalk Drive, Ricefield Branch Street, Cypress Court, Highland Hills Drive, Moore Road, Appleton Way, Mill Creek Loop, Grayson Parkway, Olde Regent Way, and Leana Drive

CLD Engineering, PLLC

Engineering and Design

TBD

Construction Contractor

Project Updates

Engineer
Monday, September 21, 2026

The Town has brought onboard CLD Engineering, PLLC to survey, design and bid the Roadway Resurfacing project. Survey is expected to begin in October 2026.