2025-2026 Town of Leland Roadway Resurfacing

Enterprise Drive

The Town of Leland is proposing to resurface 5% of Town owned roadways annually. The scope of the project includes milling, full depth patches as needed, asphalt overlay, new pavement markings, and replace and install new street signs as needed. The streets being considered for resurfacing include Enterprise Drive, Greensview Circle, Maplechase Drive, Winding Trail, Westport Drive, Tyler's Cove Way, Lanvale Hills Circle, Ashcroft Drive, Cape Fear National Drive, and Mt. Pleasant Circle.

CLD Engineering, PLLC

Engineering and Design

TBD

Construction Contractor

Project Updates

Preliminary Plan Review
Monday, January 12, 2026

Town Staff reviewed the preliminary design plans and provided comments back to the Engineer. Next steps are for the Engineer to make revisions, schedule Geotechnical crews, and submit Final Design plans to the Town for review.

Preliminary Plans
Friday, December 12, 2025

The Engineer has completed the Preliminary Design plans for the proposed roads to be resurfaced.

Design
Friday, October 10, 2025

The Engineer has begun design on the proposed resurfacing project. Completion of the design plans is anticipated for Winter 2026.

Survey
Thursday, August 14, 2025

Survey crews from ESP Associates will be out on Tuesday, August 26, 2025 to conduct mobile LiDAR survey and 2D mapping services that will be used to provide survey data for the Engineer. Imaging will take one-day in the field and then a few weeks to process and deliver the data.

Engineer
Thursday, July 17, 2025

The Town has brought onboard CLD Engineering, PLLC to survey, design and bid the Roadway Resurfacing project. Survey is expected to begin in August 2025.