U.S. Highway 17 Pedestrian Crossing

U.S. Highway 17 Pedestrian Crossing

The project will include an at-grade pedestrian crossing on US Highway 17 at the intersection of Ploof Road/Olde Waterford Way, in addition to approximately 300-feet of sidewalk on the northeast side of Olde Waterford Way to connect to the existing sidewalk network within the commercial area of Waterford and beyond.  The pedestrian crossing and associated sidewalk would create the only pedestrian crossing across the multi-lane highway and connect pedestrian facilities on both sides of the highway, that are continuing to develop with residential and retail infrastructure.  The Town received federal funding from the FY23 Surface Transportation Block Grant Program Direct Attribute (STBGP-DA) Grant for the design, permitting, right of way, and construction of the project. 

Exult Engineering, PC

Engineering and Design

TBD

Construction Contractor

Project Updates

Preliminary Right of Way Design
Monday, March 10, 2025

NCDOT has approved the Preliminary Right of Way Design plans for the project. Next steps are for the Town to request funding authorization for the right of way phase for the project.

TRC Approval
Friday, January 17, 2025

The project has received formal Town of Leland Technical Review Committee (TRC) approval for the preliminary design plans.

Environmental Review
Monday, January 06, 2025

NCDOT has approved the Environmental Review documents for the project.

Preliminary Design Plan Review
Tuesday, November 26, 2024

NCDOT and Town Staff reviewed the preliminary design plans and provided comments back to the Engineer. Next steps are for the Engineer to make revisions and submit Preliminary Right of Way Design plans to the Town for formal review.

Preliminary Design Plans
Monday, October 28, 2024

Preliminary design plans have been submitted to NCDOT and the Town for review. Design plans will be submitted to the Town's Technical Review Committee (TRC) for formal review and approval.

Survey Completed
Tuesday, October 01, 2024

Survey crews have completed field investigations and survey data has been compiled for the Engineer to use for the design plans.

Survey
Monday, September 02, 2024

Survey crews will be out over the next several weeks conducting field work and gathering data for the Engineer.

Notice to Proceed
Wednesday, August 28, 2024

NCDOT provided concurrence on the Professional Services Agreement with Exult Engineering and the Town issued Notice to Proceed to begin survey and design on the project.

Town Council Approval
Thursday, August 15, 2024

Town Council adopted Resolution R-24-052 authorizing an agreement with Exult Engineering, PC.

Engineering Firm
Wednesday, April 03, 2024

NCDOT and the Town of Leland have selected Exult Engineering, PC as the Engineering Firm to design the pedestrian crossing.