Skip to main content

Leland Highway 17 Sewer Expansion II Phase 2 (Formerly Old Town Creek Lift Station Project)

Leland Highway 17

A project to help serve the developing areas along the Highway 17 corridor with sewer south of Bishops Ridge. The project will begin at Hewett Burton Road and end at Old Town Creek Road. The station on Old Town Creek Road will be designed to accept gravity sewer flow from around the area and also additional flow from other lift stations by force main.

WithersRavenel

Engineering and Design

Civil Works Contracting

Construction Contractor

H2GO

Owner.

Project Documents

Old Town Creek Road Closure
Traffic Control/ Road Closure Plans